latestOpenAPI 3.1.02026-08-222444901.9 MB
dcb8297898a2
Contracts
Create Change Order
Create a change order on a contract. Incomplete payloads are saved as drafts. Complete payloads are validated and applied.
post/public/v2/contracts/{contract_id}/change-orders/
Path parameters
contract_idinteger required
Headers
Idempotency-Keystring
Optional. A unique value (a UUID works well) identifying this operation. If the request is repeated with the same key, the original response is replayed instead of the operation running again, so a retry cannot create a duplicate record. Results are replayable for 48 hours. Reusing a key with a different request body returns 422.
Request body
Response
Created