v1

latestOpenAPI 3.1.02026-08-06118124285.7 KB
Forecast Data

Get the calculated forecast for a forecast variable, ignoring forecast events

Getting the calculated forecast for the given forecast variable. The range between these two dates can not exceed 120 days. Forecast events are NOT taken into consideration.

get/v2/forecasts/forecast-variables/{externalForecastVariableId}/calculated-forecast

Path parameters

externalForecastVariableIdstring required

Query parameters

externalUnitIdstring required
externalSectionIdstring
startTimestring date-time required
endTimestring date-time required

Response

OK