v1

latestOpenAPI 3.0.0BSD License2026-07-24228233924.5 KB
NESO

Constraints Thermal Costs

Thermal constraints are taken when the amount of energy that would flow naturally from one region to another exceeds the capacity of the circuits connecting the two regions. This dataset provides outturn system costs for thermal constraints across a number of significant constraint boundaries.

get/gb/national-grid/constraints/thermal-costs

Query parameters

settlement_date_fromstring date required

Start date in which the energy is being delivered. Ex: yyyy-mm-dd

settlement_date_tostring date required

End date in which the energy is being delivered. Ex: yyyy-mm-dd

constraint_groupstring

The geographical area in which the constraint occurred. Each group has its own unique code, Ex: ESTEX

limitinteger

Number of results to return per page.

offsetinteger

The initial index from which to return the results.

Response

Success

countinteger required
nextstring uri nullable
previousstring uri nullable