v1

latestOpenAPI 3.0.0Creative Commons Attribution 3.02026-07-1364261347.5 KB
projects

CompleteControlPlaneUpgrade completes the rollback-safe upgrade by performing the step two upgrade for a specific cluster.

post/v1/{+name}:completeControlPlaneUpgrade

Path parameters

namestring required

Required. The name (project, location, cluster) of the cluster to complete upgrade. Specified in the format projects/*/locations/*/clusters/*.

Request body

versionstring

Optional. API request version that initiates this operation.

Response

Successful response