Manually initiates transfer runs. You can schedule these runs in two ways: 1. For a specific point in time using the 'requested_run_time' parameter. 2. For a period between 'start_time' (inclusive) and 'end_time' (exclusive). If scheduling a single run, it is set to execute immediately (schedule_time equals the current time). When scheduling multiple runs within a time range, the first run starts now, and subsequent runs are delayed by 15 seconds each.
Path parameters
Required. Transfer configuration name. If you are using the regionless method, the location must be US and the name should be in the following form: * projects/{project_id}/transferConfigs/{config_id} If you are using the regionalized method, the name should be in the following form: * projects/{project_id}/locations/{location_id}/transferConfigs/{config_id}
Request body
Response
Successful response