loadpoints
Set smart charging cost limit
Set cost or emission limit for fast-charging with grid energy.
post/loadpoints/{id}/smartcostlimit/{cost}
Path parameters
idinteger required
Loadpoint index starting at 1.
Example:1
Loadpoint index starting at 1
costnumber required
Cost limit in configured currency (default EUR) or CO2 limit in g/kWh
Response
Success - Number result
number required