Installed Generation Capacity per Unit (IGCPU / B1420) stream
This endpoint provides information about production units (existing and planned) with an installed generation capacity equaling to or exceeding 100 MW.
The database was populated from a data dump lacking publishTime values, all entries were assigned a default publishTime of 2023-01-01 00:00 during the migration.
This endpoint has an optimised JSON payload and is aimed at frequent requests for the data.
get/datasets/IGCPU/stream
Query parameters
publishDateTimeFromstring date-time required
Example:2023-01-01T00:00:00Z
publishDateTimeTostring date-time required
Example:2024-01-02T00:00:00Z
Response
Data retrieved
Example response
[
{
"dataset": "IGCPU",
"documentId": "NGET-EMFIP-CONF-00688811",
"publishTime": "2022-04-21T13:25:52Z",
"effectiveFrom": "2023-08-07",
"psrType": "Other",
"registeredResourceEicCode": "48WVPI-TRAD-BMUI",
"registeredResourceName": "DBAWO-1",
"bmUnit": "T_DBAWO-1",
"voltageLimit": 2234.1,
"installedCapacity": 1928.2
}
]